Getting ready to open up more of Auckland’s waterfront.

This summer, Auckland Council is giving the public access to more of Auckland's waterfront for the first time in a generation.

20251105 Night Lights 2799 (1)

While much work has already been done to steadily transform the wider waterfront into a welcoming space for Aucklanders and visitors to gather and connect, the Central Wharves have until now been largely inaccessible; but that’s about to change. 

Work is underway to prepare Quay Street Promenade – the area along Quay Street between Queens and Captain Cook wharves – to open to the public this December. The space will be brought to life through temporary activities, designed to entice people to visit the area while helping to inform long-term planning for the wharves.

 

Preparing the site for public use

To enable the transition from port use to a new public space, the site is currently undergoing some minor remedial works, including essential maintenance on parts of the historic Red Fence. 

From 1 November 2026, three sets of gates and their corresponding lanterns will be removed from site and taken to a workshop where repairs will be made to rusted areas and missing steel plates will be replaced. They will then be sandblasted and primed, before a top coat epoxy matching the original colour is applied. The lanterns’ glass and electrics will also be replaced.

While the gates and lanterns are in the workshop, council contractors will be on site undertaking maintenance works on the main columns. Once the repair works are complete, the fences will be returned to site and fastened into an “open” position.

The Red Fence was originally built to enclose Queens Wharf, then known as Queen Street Wharf. Construction on the fence got underway in 1913 but was halted by the waterfront strike that began that same year. Construction was eventually completed in 1923. 

The fence, along with its ornamental gates and lanterns are now designated as a category A Heritage Object by Auckland Council. 

The council has worked closely with Heritage New Zealand Pouhere Taonga to ensure the works are undertaken in a manner that respects and preserves the heritage values and integrity of the site.

 

Planning for the future

Opening Quay Street Promenade is the first stage in a longer-term programme of work underway to redevelop this part of the waterfront, helping to further strengthen the connection between the City Centre and Te Waitematā Harbour.

Before permanent development occurs, the trial opening of Quay Street Promenade will be used to inform the Central Wharves Masterplan which is currently being developed by Auckland Council in partnership with mana whenua. The Masterplan will consider the future use of Marsden, Captain Cook, and Queens wharves, the Hobson Wharf Extension and the Quay Street Promenade. 

Other projects in the City Centre

20260815 Karanga A Hape Station First Look 7426
  • City Centre
  • In Progress
  • Urban regeneration
  • Sustainability

CRL Business Connect

10/08/2026

Find out more
Precinct Downtown Development City Elevated Aug26 WEB
  • City Centre
  • In Progress
  • Urban regeneration
  • Development

Transforming Downtown Auckland

02/09/2025 - 01/01/2029

Find out more
Midtown Overview (002)
  • City Centre
  • In Progress
  • Urban regeneration

Midtown Neighbourhood

17/02/2026

Find out more
Large 221019 View 1 From Queen Street 20260223
  • City Centre
  • In Progress
  • Urban regeneration
  • Sustainability

Te Hā Noa

03/04/2023

Find out more
Aotea Render Residential Banner
  • City Centre
  • In Progress

Symphony Site & Bledisloe House developments

01/11/2020

Find out more
The CAB Restored Exterior
  • City Centre
  • In Progress

Successful restoration of the CAB

01/01/2019

Find out more
Couple Enjoying Icecream On Auckland Waterfront
  • City Centre
  • In Progress
  • Urban regeneration

City Centre Community Safety Action Plan

09/10/2024

Find out more
Community Space Render Example
  • City Centre
  • In Progress
  • Urban regeneration

Emily Place Improvements

01/09/2023

Find out more
20260420 Wellesley Street Bus Exchange
  • City Centre
  • Complete
  • Urban regeneration
  • Sustainability

Wellesley St Bus Improvements

01/10/2021 - 30/04/2026

Find out more
38 380598
  • City Centre
  • In Progress
  • Urban regeneration

High Street Improvements

01/07/2019

Find out more
20260129 Waitematā Plaza Station Opening 6676
  • City Centre
  • Complete
  • Urban regeneration

Waitematā Station Plaza

01/01/2025 - 04/12/2025

Find out more
Createlargeprev
  • City Centre
  • In Progress
  • Urban regeneration

Nelson Street Laneway

01/06/2019

Find out more
Auckland Aerials 30 Feb 24 873Webres
  • City Centre
  • In Progress

The Cloud

25/03/2024

Find out more
FP DOC REVC 42 43
  • City Centre
  • In Progress

Shaping the future of the downtown wharves: Central Wharves Masterplan

01/12/2024

Find out more
Page Banners City Centre1
  • City Centre
  • In Progress

The City Centre Action Plan

06/12/2023

Find out more