Emily Place improvements

Ongoing

  • City Centre
  • In Progress
  • Urban regeneration

The improvements project will develop the full length of Emily Place and the adjacent reserve into a people focused space.

This will allow for community activity, pedestrian movement, servicing, and community access spanning from its connections from Custom Street in the north to Shortland Street and Eden Crescent at the southern end of the site.

Community Space Render Example

About the project

The proposed improvements align with the City Centre Masterplan, which focuses on making better use of city centre spaces and improving the quality of the environment.


The key objectives are to:

  • Deliver a quality, accessible, attractive, distinctive and desirable public place
  • Create a destination that celebrates and responds to the cultural heritage and built form of the area
  • Provide a space that empowers local community-led  lacemaking and activation opportunities.

 

Design update

We are pleased to share the final design for the Emily Place Improvements Project, which aims to provide a more people‑focused environment.

We’ve now completed the detailed design phase - an important step that prepares the project for construction. The overall direction and character of the project remains consistent with the previous design update.

This final design has been developed through detailed engineering and technical coordination to meet relevant standards and operational requirements.

We’ve also been working through the necessary approval processes and site investigations to enable construction to begin.

You can explore the design in more detail through the design pack, which includes:

A snapshot of the final design
Key changes since the preliminary design
Detailed design information
Illustrative views (artist impressions) of how the space will look

View the final design here.  

 

Partnering with Mana Whenua

In partnership with Ngāti Whātua Ōrākei and Ngāti Maru, the design incorporates cultural elements that recognise and celebrate Te Rerenga Ora Iti (the former headland), the original shoreline, and the area’s native flora and fauna. 

These are expressed through:

  • Mahi toi (artworks), cultural plinths and feature seating that reflect local narratives and identity
  • Carefully placed kōhatu (stones) to support storytelling, spatial definition and informal gathering
  • Integrated native planting and trees that reconnect the site with its natural landscape.

 

Community engagement on concept design

Community consultation on the draft concept plan wrapped up in October 2023. 

  • Read the engagement report here.
  • Find out what we did with your feedback here.
  • View the concept plan here. 
  • View the Preliminary Design here
  • View the final design here.

 

What happens next?

The design for the Emily Place Improvements Project is now complete, and the project is moving into the construction preparation and procurement phase.

Construction start date, duration and staging will be finalised following procurement, in collaboration with the selected construction contractor. This will take into account other construction activity in the area and the findings from the Community Impact Assessment. Subject to approvals, the construction contractor is expected to be appointed in late 2026. 

We will continue to keep you updated as the project progresses.

 

Delivered by

The Emily Place improvements project is made possible by funding from the City Centre Targeted Rate and is being delivered by Auckland Council.

 

More information

If you want to know more about the project, please email:  emilyplace@aucklandcouncil.govt.nz 

 

Subscribe

Subscribe to the Emily Place Improvements Project eNews here.

Other projects in the City Centre

Mills Lane And Swanson 2
  • City Centre
  • In Progress
  • Urban regeneration

Mills Lane and Swanson Street Improvements

02/11/2026

Find out more
TSC Render Thumb
  • City Centre
  • In Progress

Symphony Site & Bledisloe House developments

01/11/2020

Find out more
The CAB Restored Exterior
  • City Centre
  • In Progress

Successful restoration of the CAB

01/01/2019

Find out more
Precinct Downtown Development City Elevated Aug26 WEB
  • City Centre
  • In Progress
  • Urban regeneration
  • Development

Transforming Downtown Auckland

02/09/2025 - 01/01/2029

Find out more
20251105 Night Lights 2799
  • City Centre
  • In Progress
  • Urban regeneration

Opening Up Auckland's Waterfront

30/10/2026

Find out more
20260815 Karanga A Hape Station First Look 7426
  • City Centre
  • In Progress
  • Urban regeneration
  • Sustainability

CRL Business Connect

10/08/2026

Find out more
Midtown Overview (002)
  • City Centre
  • In Progress
  • Urban regeneration

Midtown Neighbourhood

17/02/2026

Find out more
Large 221019 View 1 From Queen Street 20260223
  • City Centre
  • In Progress
  • Urban regeneration
  • Sustainability

Te Hā Noa

03/04/2023

Find out more
Couple Enjoying Icecream On Auckland Waterfront
  • City Centre
  • In Progress
  • Urban regeneration

City Centre Community Safety Action Plan

09/10/2024

Find out more
20260420 Wellesley Street Bus Exchange
  • City Centre
  • Complete
  • Urban regeneration
  • Sustainability

Wellesley St Bus Improvements

01/10/2021 - 30/04/2026

Find out more
38 380598
  • City Centre
  • In Progress
  • Urban regeneration

High Street Improvements

01/07/2019

Find out more
20260129 Waitematā Plaza Station Opening 6676
  • City Centre
  • Complete
  • Urban regeneration

Waitematā Station Plaza

01/01/2025 - 04/12/2025

Find out more
Createlargeprev
  • City Centre
  • In Progress
  • Urban regeneration

Nelson Street Laneway

01/06/2019

Find out more
Auckland Aerials 30 Feb 24 873Webres
  • City Centre
  • In Progress

The Cloud

25/03/2024

Find out more
FP DOC REVC 42 43
  • City Centre
  • In Progress

Shaping the future of the downtown wharves: Central Wharves Masterplan

01/12/2024

Find out more
Page Banners City Centre1
  • City Centre
  • In Progress

The City Centre Action Plan

06/12/2023

Find out more